To do this, open the app and go to System and then to Settings. Next click System integrationand then Active charging current control and follow the instructions in the app. The following parameters must be set:
Step 1/2:
Charging current control parameter overview |
App Parameter | Setting |
External meter | Selection: - Modbus SunSpec (TCP) Note: The inverter must support SunSpec 1.1 information model 113. |
IP address of the external Modbus TCP meter | Entry of the inverter's IP address (Note: The inverter must be assigned a static IP address in the network so that it never changes, even with DHCP assignment) |
Port of the external Modbus TCP meter | 502 (standard - reserved for Modbus) |
External meter connection type | Selection: |
Step 2/2:
Charging current control parameter overview |
App Parameter | Setting |
Active charging current control | Activate |
Charging mode | Selection: The vehicle is charged as quickly as possible at 11 kW. PV charging from approx. 4.1 to 11 kW If the minimum charging power is not reached, the charging process is automatically continued with mains power. PV charging from approx. 1.4 to 11 kW If the minimum charging power is not reached, the charging process is continued with mains power. Activation of the automatic phase disconnection is required. Charging is exclusively with PV power, without mains power. If the minimum charging power is not reached, the charging process is paused. Activation of the automatic phase disconnection is required. |
Once parametrisation is complete, click Apply and transfer the settings to the Spelsberg Wallbox via NFC or network communication.